Пути предупреждения прилипания компоновки низа бурильной колонны к стенке скважины
Ю М Гержберг, В И Киршин, А В Кулигин et al. · CyberLeninK (CyberLeninka) · 2013
We consider prevention issues of BHA sticking as a result of its sticking to the well wall. The technological decisions on repeated reduction of the area of BHA contact with a clay crust by use of intermediate basic elements of different design which have the diameter bigger than the weighted pipes, but smaller than the chisel are provided. On the basis of calculations of the intense deformed condition of BHA in the space limited to well walls, we received the dependences defining placement of basic elements depending on a ratio of diameters of pipes and basic elements, and an antiaircraft corner of a rectilinear site of well.
Cited by 0 works.