Организационно-технологические решения строительства центров обработки данных под нагрузки искусственного интеллекта: требования, риски, регламенты
Р. О. Самсонов, В. С. Лоткин · Stroitel stvo nauka i obrazovanie [Construction Science and Education] · 2025
Introduction. The rapid growth of AI workloads has shifted the key constraints of data centres from floor space and air cooling to available connection power, heat removal capacity, and water infrastructure. AI-ready is becoming an inherent property of building design: decisions regarding liquid/immersion cooling schemes, heat recovery, redundancy, and commissioning programs must be made at early stages and formalized within design specifications and tolerances. Materials and methods. A targeted review of publications was conducted, incorporating peer-reviewed papers and relevant standards (EN 50600, ASHRAE TC 9.9 guidelines, ISO/IEC 30134 series). Sources were thematically coded under the categories: “cooling/heat removal”, “power supply”, “water and ecology”, “site layout and configuration”, and “regulations and KPI”. Analysis was performed as a mapping of “AI requirement → building solution → measurable parameter”, resulting in a correspondence matrix and a risk-mitigation framework structured as “risk → mitigation measure → KPI → acceptance method”. This approach effectively linked academic literature with practical engineering tolerances and testing procedures. Results. The target architecture for high-density AI clusters requires implementation of liquid cooling circuits with readiness for immersion cooling, validated resilience of power supply against transient loads, establishment of water usage effectiveness (WUE) KPI on par with PUE, and design of interfaces for low-grade heat recovery. Efficiency is enhanced through modularity and factory-built modules, staged power ramp-up, and digital twin technologies. An integrated risk map and a regulatory compliance matrix are proposed, explicitly linking standards to design parameters and acceptance procedures. Conclusions. “AI-readiness” emerges as the outcome of coordinated organizational and technological construction decisions. A management framework encompassing KPI budgets during design phase, a requirements-compliance matrix, and a stress-testing program ensures reproducibility of target metrics (PUE/WUE/ERE/ERF), control over schedule and cost, and accelerated achievement of designed computational capacity.
Cited by 0 works. doi:10.22227/2305-5502.2025.4.11 Open-access PDF
Authors
References
- Data centre water consumption
- Liquid cooling of data centers: A necessity facing challenges
- Waste heat recoveries in data centers: A review
- Enhancing data center cooling efficiency and ability: A comprehensive review of direct liquid cooling technologies
- Waste heat from data centers: An investment analysis
- The water use of data center workloads: A review and assessment of key determinants
- Water-energy tradeoffs in data centers: A case study in hot-arid climates
- Enough hot air: the role of immersion cooling
- Power Modeling for Effective Datacenter Planning and Compute Management
- Dynamic Model and Converter-Based Emulator of a Data Center Power Distribution System