Исследование процесса включения трансформаторов через установку продольной компенсации

В. Г. Бауман, В. М. Квятковский, О. В. Иванов et al. · Journal of Mining Institute · 1966

The installation of longitudinal compensation (CPC) of voltage losses in the distribution network of the mining site was first tested in production conditions at one of the sites of the Kirov mine of the Slantsy Combine in 1964. In the experimental operation of the CPC, the feasibility and efficiency of automatic voltage regulation by series capacitors in the network of the site were proved. Inclusion of the longitudinal compensation unit allows obtaining a voltage increase at the longwall face distribution point by 20-25% at motor starts and by 10-15% at nominal load ...