ВИБІР ПЕРСПЕКТИВНОЇ ЗБІРНО-МОНОЛІТНОЇ ТЕХНОЛОГІЇ

М. Д. Почапський, М.Д. Помазан, С.В Бутник · The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy · 2026

Ukraine is facing the urgent challenge of restoring buildings and structures damaged or completely destroyed by military aggression in the shortest possible time. After World War II, similar reconstruction tasks in the country were successfully addressed through the extensive use of precast reinforced concrete structures. However, since 1991, following the transition to a market-based economic system, most house-building combines have ceased to exist. As a result, brick and monolithic (cast-in-place) buildings have largely replaced typical large-panel construction. Monolithic systems offer the highest structural reliability, but also the highest cost, whereas brick and panel systems demonstrate the opposite trend. Resolving this contradiction requires the identification of systems that are both structurally dependable and cost-effective. Furthermore, modern reconstruction solutions must ensure rapid deployment, safety, energy efficiency, ergonomic design, and architectural expressiveness. Precast-monolithic construction technology, which integrates the advantages of both precast and monolithic systems, has the potential to meet these requirements. Given the wide variety of precast-monolithic systems, selecting the optimal solutions remains a complex task. To initiate addressing this issue, the study analyses the structural and technological schemes and key components of the most widely implemented precast-monolithic systems in global practice, providing insights that may support the selection of an optimal system and the integration of solutions across different technologies. A hypothesis is proposed that precast-monolithic systems have undergone natural technological selection, yielding technologies that are now applied in Ukraine’s construction practice. To determine the most promising system, the study compares labour intensity and construction duration for a 12-storey residential building designed using different structural approaches. Based on the option comparison, a modified version of the French PPB-Saret system was selected as the optimal solution, offering the highest degree of prefabrication along with the lowest labour demand and shortest construction time.

Cited by 0 works. Open-access PDF

Authors