道路の除雪計画についての一考察-自動車の走行速度から見た-

有賀 世治 · Institutional Repositories DataBase (IRDB) · 1969

AbstmctRoad tra冊c volume in a snowy district depends upon the status of snowfall and snow・ removing work.The author has conducted measurements for obtaining the relation between the snow・ removal system and the running speed of motorcars on the National Road No,17and its neighboring local roads,and investigation of road tra筋c was made there too. According to the results obtained,the author proposes an opinion that,in making the p1an of snow remova1from roads, especia1ly from1oca1ones,the functional relations between the width of snow removal,the running speed of motorcar and the tra伍c volume are to be sought in the丘rst place,and then consideration should be given to the securing of tra冊c faci1ities corresponding to economic effects.

Cited by 0 works. doi:10.24732/nied.00000672 Open-access PDF

Authors