内部構造を木質化した建築物の延焼防止性能検証
圭佑 樋本, Keisuke Himoto · Institutional Repositories DataBase (IRDB) · 2020
Case study on an office building is conducted using a novel performance-based method for verifying compatibility of fire spread prevention performance of a building with that required by the building standard law. In order to relax the restriction on the fire-resistive performance of the inner wall and floor to be equivalent to the quasi-fire-resistive construction of 45 minutes, it is necessary not only to improve the fire-resistive performance of the external wall and window, but also to subdivide the inner space into several fire compartments.