「HTTR水素製造システム用水蒸気改質器」のモックアップ試験とその評価

明 清水, 卓爾 藤川, Nobuaki Murakami et al. · Institutional Repositories DataBase (IRDB) · 2009

The Japan Atomic Energy Agency started the construction of High Temperature Engineering Test Reactor (HTTR) in the Oarai Laboratory in 1991. HTTR attained reactor-outlet temperature of 950℃ in April 2004 and is now continuing various tests concerning the nuclear reactor and intermediate heat exchanger (IHX). The agency plans to connect this HTTR and hydrogen production system with the steamreforming method in future. The mock-up test facility of steam reforming with single reaction tube of 1/30 scale model in capacity was constructed as a separate facility from HTTR. Various tests were performed from 2002 to 2004. This facility produces about 120N㎥/h hydrogen in steam reformer using helium gas heated by a 423 kW electric heater. In this mock-up steam reformer, many measuring instruments were set to monitor the temperatures, pressures and flow rates, and the characteristics of heat transfer and steam reforming were recognized. This paper describes the heat transfer and hydrogen production test results and their evaluation. In particular, structural survey, heat transfer characteristics, strength design and performance estimation for the steam reformer are desctibed.

Cited by 0 works.

Authors