УЗГОДЖЕННЯ РОБОТИ НАФТОВОГО ПОКЛАДУ І СВЕРДЛОВИНИ В ЧАСІ ЗА УМОВ ГАЗЛІФТНОГО ФОНТАНУВАННЯ ПРИ ПРОЕКТУВАННІ ТА ЕКСПЛУАТАЦІЇ СВЕРДЛОВИНИ

Василь Степанович Бойко, B. M. Mishchuk, Т. С. Веклин · PRECARPATHIAN BULLETIN OF THE SHEVCHENKO SCIENTIFIC SOCIETY Number · 2019

Joint and interdependent operation of flowing well and oil pool in the mode of dissolved gas, which allows to calculate the time change of minimum bottom-hole pressure was investigated.Methodology for calculating the conditions of joint operation of oil pool and flowing well based on solution of equations of fluid filtration in the layer and traffic flow in the well bore was investigated and proposed. Modes of coordinated and uncoordinated work of these two units, as well as steady and uneven operation which must be considered during the design and operation of wells were highlighted.