Перспективы увеличения мощности Богучанской ГЭС
А. Н. Волынчиков · Gidrotehničeskoe stroitelʹstvo · 2021
The Boguchanskaya HPP on the Angara River was put into operation at full capacity in 2017. At present, it is a successful energy company with high capacity indicators. The use of state-of-the-art technologies, up-to-date calculation and design tools made it possible to execute the design of the generator with a power reserve at the manufacturing stage without its reconstruction. During the equipment operation and its monitoring, the possibility of increasing the unit capacity of the hydroelectric units was identified and design validation was made for the possibility of increasing the capacity from 340 to 360 MW at heads of 65,5 to 70,8 m.
Cited by 0 works.