Контроль водонепроницаемости инверсионных кровель жилых зданий на стадиях устройства и приемки работ
Евгений Михайлович ВИШТОРСКИЙ, Азат Рушанович Самигуллин · Stroitelʹnye i dorožnye mašiny · 2026
The paper discusses approaches to verifying the waterproofness of inverted roofs in residential buildings during installation and acceptance. Based on as-built documentation and instrumental inspection protocols from 18 projects (total area 54,320 m2), typical defects of PVC/TPO membranes and two-layer bitumen-polymer systems are summarized. Because the waterproofing layer becomes inaccessible after insulation and ballast are installed, integrity checks should be performed before subsequent layers are placed and documented as part of concealed works records. The practical applicability of electrical methods (EFVM and high-voltage spark testing) and water flood testing is compared. The discussion is aligned with the Russian regulatory framework (Order of the Ministry of Construction of Russia dated May 16, 2023 No. 344/pr, SP 17.13330, SP 71.13330 and SP 48.13330).
Cited by 0 works.