The authors have considered an engineering solution to develop the Karnasurtsky thin flat ore bodieslocated in the Lovozersky deposit by a double-cutmining method. It has been set that the stoping excavation of balance reserves by double-cuts willmake it possible to apply rock anchor for supportingroof’s rocks. The rock anchor application in a stoping face with a limited height instead of in-block pillars and a selective excavation technology in termsof ore and rocks blast-separation of footwall in asecond cut reduce losses and dilution of the minedore by 9-11% and 22-27%, correspondinly.