ОПТИМІЗАЦІЙНІ ТЕНДЕНЦІЇ В ПРОГНОЗУВАННІ ТРИВАЛОСТІ БУДІВНИЦТВА
І. В. Шумаков, Р.И. Микаутадзе, И. И. Ляхов · Scientific Bulletin of Civil Engineering · 2018
The key trends in optimizing and forecasting the duration of construction of various-purpose properties have been outlined. Contemporary data characterizing frequent failures to meet the projected construction deadlines has been analyzed. It was established that these situations result in increasing construction costs. Based on a comparative analysis of regulatory documents in various countries, it was established that most of them use their own, national universal databases with information regarding actually-implemented projects, which serve asanalogs. The effect of industrialization of construction, use of current methods and comprehensive mechanization of work on the duration of construction was reviewed. It was determined that in any of the reviewed information systems, geotechnical and hydrogeological risks, logistical risks (taking into account the availability and characteristics of storage space on the site), and work mechanization parameters have been identified among the forecasted factors of managerial type. A number of important tasks have been considered in the context of optimizing the duration of construction, including: monitoring productivity of construction machinery, planning maintenance cycles, identifying logistics effectiveness improvement trends, optimizing the sequence of construction works (in particular, taking into account climatic conditions), improving effectiveness of fuel use, minimizing unplanned downtime, forecasting operational failures. The results of research presented here may be used when forming and improving electronic digital schemes of forecasting the duration of construction.
Cited by 0 works.