ГЕОДЕЗИЧНИЙ МОНІТОРИНГ ТА РОЗРАХУНКИ СХИЛУ ПРИ БУДІВНИЦТВІ МОСТОВОГО ПЕРЕХОДУ В КИЄВІ
П. Є. Григоровський, В. О. Басанський, V.V. Lyalko et al. · Scientific Bulletin of Civil Engineering · 2020
The purpose of the presented research was to analyze the results of geodetic monitoring of the slope and calculations of its stability of the slope within the retaining walls. The scientific significance of the results is reflected in the obtained dependences for isopoles of total deformations on the calculated cross section and plastic deformations in the soil mass on the calculated cross section in the natural soil moisture. The practical significance is contained in the obtained results of calculations and in the possibility of their replication for similar problem slopes. The results of calculations of slope stability within retaining walls and geodetic monitoring of the slope are presented. A mathematical model «soil ‒ retaining walls» is built, which takes into account their simultaneous work. Deformations in retaining walls and general stability of the slope section are determined. The calculation of the slope stability was performed using the finite element method in the software and calculation complex «PLAXIS». Geodetic monitoring of the plan-height position of the points of the geodetic network is performed through the construction of a linear-angular network using a high-precision electronic total station. The results of comparing the maximum displacements of observation points in the horizontal and vertical directions according to the monitoring data are well correlated with the calculated data, the actual deformations coincide with the calculated ones. The forecast of deformations by calculation shows stabilization of a slope after the termination of construction works at a stage of operation of building of a slope. Confirmation has been obtained that the slope in its natural state will stabilize and provide the appropriate coefficient of stability.
Cited by 0 works.