ДОСЛІДЖЕННЯ ПРОЦЕСУ РУЙНУВАННЯ КОНСТРУКЦІЙ КАНАЛІЗАЦІЙНОГО ТУНЕЛЬНОГО КОЛЕКТОРУ

Ю.В. Булгаков · Scientific Bulletin of Civil Engineering · 2015

Provides an overview of the sewerage system of the city of Kharkov, its length and depth of the. The state of the construction of sewage tunnel collector. It is concluded that the main factor affecting its useful life, is the crest of the corrosion. Destruction, as structures lining and tubing was the result of corrosion processes occurring inside the manifold. It is shown that one of the main issues is currently the choice of recovery method, as an emergency site and the entire collector, whose length is 440 m between the mines.

Cited by 0 works.