МОДЕЛЮВАННЯ ОРГАНІЗАЦІЇ БУДІВНИЦТВА ТРАНСПОРТНИХ БУДІВЕЛЬ
А.М. Малявін, А.О. Шевченко, О.І. Матвієнко et al. · Scientific Bulletin of Civil Engineering · 2018
In the process of creating a model and optimizing it, they determine: the list and scope of work, their laboriousness and technological sequence, the possibility of dividing the general scope of work into private fronts − captures; the degree of parallelism of the performance of work of one type in the captures; degree of combination of different types of work in time and space; the possibility and feasibility of the production of works with constant or variable cast of performers (links, brigades); Deadlines and resource requirements. With regard to the modeling of the organization of construction of transport buildings, the permanent parameters of the system will be the directive or regulatory period for the construction of railway station buildings, in general or for launch complexes; station category (according to the previous classification); the nomenclature of the objects erected at each stage; technological sequence of works on each structure; the amount of work in natural meters on each structure.
Cited by 0 works.