Модель прогнозирования коррозионной поврежденности магистральных газопроводов и метод прогнозирования роста протяженности коррозионно-опасных участков газопроводов
Нефёдов Сергей Васильевич, Прокопенко Андрей Юрьевич · Вести газовой науки · 2014
Planning of trunk gas pipeline capital repair volumes is based on evaluation of the quality and the degree of hazard of corrosion pipe defects and length of damaged sites. The corrosion condition of gas pipelines is evaluated and predicted for repair planning primarily on the basis of the results of in-line defectoscopy in compliance with effective regulatory documents. The proposed method of gas pipeline corrosion condition forecast is based on statistic assessment of change in the parameters of distribution of the relative indicator «defect hazard rank» and the number of hazardous defects (and defective pipes) of a long TGP section. The speed of change of the total pipe number with corrosion defects is proportional to the operating time; no occurrence of new defects is taken into account. The following suppositions serve as the basis for the method (model): the originated defects develop and grow irregularly, therefore the behavior of a combination of corrosion defects in general is evaluated at the section between CS; the date of occurrence of new defects is assumed 6 (for pipes with film insulation) and 10 (for pipes with bitumen insulation) years after the end of construction; the behavior of the total defect massif is evaluated; the speed of corrosion at different local sites is not evaluated; the defect growth rate in each range of relative depths is defined by the ratios of defect transfer from the previous to the successive ranges of relative depths. The predicted number of occurring defects and the transfer ratios are defined on the basis of the maximization criterion of the correlation between the initial model of the defects rate and the available defects rate on the basis of the secondary pipeline control facility data processing. A method for prediction of growth of the number of sites requiring reduction of the operating pressure or repair measures was developed on the basis of the model for stimulation forecast of growth of the number and depth of corrosion defects and the procedure of detection of the correlation between distribution of parameters characterizing the degree of defect hazard (relative depths of defects, operating time before repair and permissible operating pressure in defect pipe zones).
Cited by 0 works.