Unit Commitment With Primary Frequency Regulation Constraints
José F. Restrepo, Francisco D. Galiana · IEEE Transactions on Power Systems · 2005
The unit commitment problem with tertiary reserve requirements has been broadly studied. Such reserves, when needed, are centrally deployed with relatively slow time constants of the order of minutes. In contrast, the scheduling of units offering primary frequency regulation reserve deployable in a decentralized manner within seconds of a contingency has received relatively little attention. In this paper, we formulate and solve a multiperiod unit commitment that simultaneously accounts for both primary and tertiary reserve constraints. What makes this scheduling problem particularly challenging is the characteristic that primary frequency regulation reserves have a common single degree of freedom, namely, the system frequency deviation.
Cited by 198 works. doi:10.1109/tpwrs.2005.857011
Authors
References
- Power Generation, Operation, and Control
- The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee
- Introduction to linear optimization
- Electric Energy Systems Theory: An Introduction
- Power generation operation and control — 2nd edition
- Understanding automatic generation control
- The generalized unit commitment problem
- Load frequency control issues in power system operations after deregulation
- Competitive procurement of ancillary services by an independent system operator
- Network-constrained multiperiod auction for a pool-based electricity market